Bricklaying and blocklaying
Brick veneer and cavity walls, blockwork, arches, paving, mortar, flashings and set-out.
Certificate III level, mapped to CPC33020 · 95 lessons · the first three are free
Every lesson is read aloud, with drawings, the standards that apply named and linked, and a quick test. The course is mapped to the units of competency in the national training package on training.gov.au. Your registered training organisation (RTO) teaches and assesses the qualification. Champion Skills is not a registered training organisation and does not award qualifications.
Before the job
Site establishment
- Prepare for brickwork: plans, quantities, hazards and the delivery check
- Unload, sort, blend and stack bricks so the wall goes up without double handling
- Set up the mixer and mix M3 mortar the same every time
Substructure
- Prepare for flashings and DPC: read the details, count and check
- Prepare DPC and flashings: inspect, locate, prepare and cut
- Install the DPC, flashings and weep holes in brick veneer
Frame
- Prepare to lay brick walls and corners: read the wall details, plan the order and check the gear
- Set out brick walls and corners: face lines, plumb profiles and the course gauge
- Lay brick walls and corners: level base courses, plumb corners, true bond and finished joints
- Prepare for multi-thickness walls and piers: read the details, count the bricks and plan the job
- Set out bonded walls and piers: read the bond, mark the footing and gauge the piers
- Build bonded walls and piers: straight, level, plumb, in gauge and clean
- Prepare to build a brick arch: read it, check it and count it
- Build the abutments of an arch to the springing line
- Set out an arch full size and set up the centre
- Cut and lay the voussoirs and spandrels of a gauged arch
- Prepare to build curved walls: read the curve, check it, count it
- Set out and lay a curved wall with a trammel
- Set out and lay a serpentine wall
- Prepare to build a reinforced block structure with engaged piers
- Set out load-bearing blockwork: walls, engaged piers, bond, gauge and reinforcement
- Build reinforced blockwork with engaged piers: lay to the bars, place the steel, tie down and prepare the cores
- Finish blockwork joints: iron them to the face shell and brush the wall before it dries
- Prepare for AAC work: read the plans and the maker's guide, work out the blocks and check what arrives
- Set out AAC blockwork: wall lines, gauge, bond, DPC, ties and openings
- Lay AAC blockwork: first course in mortar, thin-bed courses, lintels, ties and tie-downs
- Install AAC floor panels: check the supports, place the panels and grout the ring anchor
- Install AAC wall panels on a timber frame: base, top hats, panels, joints and seals
Roof
- Prepare to build a fireplace and chimney: read the drawings and the code, plan and order
- Set out the fireplace base and lay it to hearth height
- Build the firebox and inner hearth, set the lintel and corbel the gather
- Form the smoke shelf, check the throat and fit the damper
- Corbel and parge the smoke chamber
- Build the flue with an offset that breaks the light, and parge it
- Complete the chimney stack: tray, stack, cap, finish and outer hearth
External envelope
- Prepare for brick veneer: read the hidden parts, work out the extras and plan the job
- Set out brick veneer: the face line, the gauge rod and the bond
- Build the base of the veneer: load out, mix the mortar, lay the DPC and leave the weep holes
- Build the veneer walls: ties, sills, lintels, flashings and joints to the eaves
- Finish the veneer: clean the cavity, tool the joints and clean the face
- Prepare for cavity brick: read the structure, work out both leaves and plan with the other trades
- Set out cavity brick: square the corners, mark both leaves and set the openings to gauge
- Build the cavity base: both leaves, subfloor vents, DPC and weep holes for a suspended floor
- Build the cavity walls: frames, lintels, flashings, roof tie-down, gables and parapets
- Finish cavity brick walls: tool the joints and brush the face before it dries
- Prepare to install glass blocks: read the system, size the panel and check every component
- Set out a glass block panel: opening, lintel, flashing and mortar
- Lay a glass block panel: strips, anchors, blocks and joints
- Prepare for decorative brickwork: read the feature, count the specials and plan the cuts
- Set out decorative brickwork: mark the feature, draw the panel full size, colour the mortar and sort the bricks
- Lay decorative brickwork: plinth, sill, herringbone panel, dentil, dogtooth and corbels
Lock-up and lining
- Prepare for a fire-rated separating wall: read the FRL, count the bricks and plan it with the roof
- Build the separating wall: solid joints, a clean cavity, a raking top and the gap packed under the roof
Fit-out
- Plan refractory work: read the kiln drawings and data sheets, check the evidence, count the bricks and set the order
- Prepare for refractory work: check the delivery, reject what does not conform, check the tools and fit your PPE
- Start a refractory job: set out the position, load out blended bricks, mix the fireclay and keep the boards full
- Set out a fire brick wall and prepare the base: square, dry, level, flat and dry-bonded
- Lay fire brick in header bond: thin full joints, true bond, line, level and plumb to the springing
- Form a segmental arch: span and rise, full-size set-out, centre on adjustable props, and the key brick marked
- Cut and lay the arch: skewbacks, eleven matching voussoirs, the key brick and the spandrels
- Complete the fire brick arch: strike the centre, clean and repoint the intrados, clean the wall and check it
External works
- Prepare a retaining wall project: read the wall, check the approval, plan the hazards and order the materials
- Set out a retaining wall: fence and sign the area, mark the services, peg the line, set benchmarks and profiles
- Build a segmental block retaining wall: base, first course, drainage, courses and caps
- Finish a retaining wall: check it against the drawing, test the drain, clean up and report faulty gear
- Prepare for paving: read the levels, find the services and work out the materials
- Set out a paved path: read the ground, set the depth, and peg the levels and falls
- Dig, drain, build the base and screed the sand bed to the falls
- Lay pavers to pattern, cut the edges, compact, joint and finish the perimeter
- Prepare for masonry steps: read the stair rules, count the bricks and set up safely
- Set out masonry steps: work out the rise and going, mark the footing and line up the wing wall
- Lay masonry steps and a sloping wing wall: even risers, falling treads and clean mitres
- Prepare for a battered retaining wall: read the batter, the footing and the drainage, and plan the job
- Build a battered wall and buttress pier: set the batter profiles, lay level courses to the lean, and cap it
- Plan the subgrade and base for paving: read the soil, test it and work out what it needs
- Get ready to dig: plant, materials, drainage, termite barriers and the DPC
- Dig out a paved path: set the depth, work out the spoil, strip, excavate and build the base
- Bedding course: check the sand, lay the geotextile, apply the slope rules and spread the bed
- Screed the bedding sand to the strings and clear the excess
- Plan the paving: read the pattern and tolerances, count the pavers and set the laying order
- Prepare to lay: check the tools, check the pavers and stack them blended
- Lay the pavers: set a string grid, lay to pattern without stress and hold the tolerances
- Plan the paver cutting: silica, noise and power, the cutting area and the order of cuts
- Cut the pavers: check the saw and blade, set it up level, and make clean cuts
- Plan the finishing: edge restraint, interlock, jointing materials, quantities and plant
- Set the pavers: secure the edge, joint and compact until full, and replace damaged pavers
Maintenance, repair and renovation
- Plan a repointing and tuck pointing job: read the wall, work out the mortar and set up safely
- Prepare old brickwork: replace broken bricks, rake the joints and mix the mortars
- Repoint the joints and lay the tuck pointing ribbon
- Plan a paving repair: assess the damage, find the cause and work out the materials
- Prepare for a paving repair: set the order with others, check the tools and match the materials
- Repair segmental paving: lift without damage, rebuild and relay, joint to match, and treat stains and efflorescence